Confidential Data Centre E2

A 3MW extension to an existing data centre in London Docklands providing additional White Space

The building was a recent addition to the providers portfolio which required deviations to their model design.

The cooling plant was provided as part of a previous phase but our scope included new white space and power strings to provide distributed redundant power to PDU’s / RPP’s, additional transformers and generators in a standalone addition to the building.

Desco carried out a Peer review of the Stage 3 Design and Stage 4A duties across the majority of services in the facility.

 

 

Location

London

White Space

3850m2

IT Capacity

3MW

Year

2020/21